Language:
  • EN

Commissioning and Start up of our GEA Westfalia pro2200

Our service team successfully commissioned  a GEA Westfalia Decanter pro 2200 installed at the end user’s biological treatment facility in the area of Volos in Greece.

The project scope was designed to optimize sludge dewatering performance within the plant’s wastewater treatment line for a dairy production environment.

Our design and service team delivered and commissioned the whole balance of plant including :

  • GEA Westfalia Decanter pro 2200 - 10 deg bowl with compact control cabinet for automated and unmanned operation.
  • Polymer preparation plant ensuring accurate dosing and mixing for flocculation efficiency.
  • Polymer pump designed for reliable and continuous feeding.
  • Screw conveyor for effective sludge handling and discharge.
  • Custom metal base engineered for stable decanter installation and vibration reduction.

All peripheral  equipment our controlled via our Decanter’s PLC.

 

This turnkey setup strengthens the overall efficiency of the dewatering unit, improves operational reliability, and contributes to sustainable wastewater management in food production.